February 2026 – The publication of France’s 3rd Multiannual Energy Programme (PPE 3) marks a turning point for the country’s energy transition, setting binding targets for offshore wind and unlocking unprecedented industrial opportunities for European players. With 15 GW of offshore wind capacity targeted by 2035 (and 18 GW by 2037), France is positioning itself as a major European hub for floating wind technology. Brittany, home to strategic projects and world-class port infrastructure, is at the heart of this ambition—offering concrete avenues for collaboration, investment, and supply chain integration.
PPE 3: A Clear Roadmap for Offshore Wind
The PPE 3 establishes a clear, long-term framework for offshore wind development, backed by public investment and industrial policy:
– 15 GW of offshore wind by 2035, rising to 18 GW by 2037 (with a significant share of floating wind). See the project map.
– €40 billion+ in investments committed by the offshore wind industry over the next 15 years (Offshore Wind Pact, March 2022)
– 20,000+ jobs projected in the offshore wind sector by 2035 (currently 8,254 direct jobs)
– 10 GW of tenders to be launched by 2027, including floating wind projects Bretagne Sud (500 MW) and Bretagne Nord-Ouest (1.2 GW). BGL, the largest floating wind zone in France, has been identified as a priority area for the long-term development of deep-water floating wind, with a horizon of 2050.
– Industrial localization requirements: Tenders will prioritize projects with strong European supply chain integration, in line with the Net Zero Industry Act.
Why this matters for Europe: France’s offshore wind build-out is designed to complement North Sea capacity, diversify Europe’s energy mix, and create a sovereign industrial ecosystem—reducing dependence on non-EU suppliers.
Brittany: Europe’s Gateway to Floating Wind
Brittany is a cornerstone of France’s floating wind strategy, hosting three of the country’s most advanced projects:
Flagship Projects in floating wind
Brittany is home to three major floating wind projects, two of which are at an advanced stage of the tendering process, whilst the location of the third has yet to be finalised.
– Bretagne Sud 2: A 500 MW floating wind project currently under development, serving as an extension of the Bretagne Sud 1 wind farm awarded to Pennavel. Pending the publication of the tender specifications, 9 candidates have been pre-qualified.
– Bretagne Nord-Ouest (BNO): A 1.2 GW floating wind farm project in north-western Brittany, currently in the tender preparation phase, with the tender specifications due to be published in 2026, and environmental and technical studies currently underway.
– Bretagne Grand Large (BGL): Area identified as a priority for the development of deep-water floating wind power by 2050.
Ports of Brest and Lorient: Strategic Assets
Strategically located in relation to these projects, the ports of Brest and Lorient offer major advantages for project developers:
– Brest: 40ha of industrial lots connected to sea and transport networks, dedicated quays for floating wind assembly, and a growing cluster of 100+ SMEs specializing in marine renewables.
– Lorient: Logistics hub for O&M, with direct access to AO9 and BGL sites, and a skilled workforce trained in maritime trades.
Supply Chain & Skills
Brittany’s industrial ecosystem stands out for its end-to-end capabilities in offshore wind, with 200 companies positioned across the entire value chain—from manufacturing to operation and maintenance (O&M). Breton firms have built globally recognized expertise through high-profile projects in Europe and beyond, making the region a strategic partner for European stakeholders.
Find your partner
Timeline & Key Milestones
| Year | Key Milestone |
| 2024 | Saint-Brieuc (496 MW) operational |
| 2026 | AO9 tender awarded; AO10 tender launched |
| 2032 | Bretagne Sud 1 – Pennavel (250 MW) commissioned |
| 2032–2034 | Bretagne Sud 2 (250 MW) commissioned |
| 2035 | BNO (~2 GW) commissioned; 15 GW national target |
| 2050 | BGL (Bretagne Grand Large) – large-scale deep-water floating wind zone |
Call to Action: Partner with Brittany Today
France’s PPE 3 is a once-in-a-decade opportunity to shape Europe’s offshore wind future. Brittany offers:
– Ready-to-go projects (AO9, AO10, BGL) with clear timelines.
– World-class ports and a skilled workforce.
– Strong public support for industrial localization and innovation.

